Schedule Optimisation for CBS
|
'Nesting' the optimum cycle lengths into a repeatable pattern.
|
| The optimum point of the optimisation lies on a shallow curve, indicating that there will only be a small cost implication if we deviate from the optimum. It is this fact that allows us to set the length of time between replenishments (the cycle length) in a CBS approach to whole weeks that form a repeatable pattern when we combine all the SKUs on a production line.
|
|